"In this project, the commonly used material receiving quantity, stock control setting records etc. in 2016 are used for the calculation of performance. The improvement outcome after the introduction of the system is summarized in the following: 1. Save operation working hours of 1,081 hours/month, equivalent to the manpower of approximately 6.8 people. 2. Improve commonly used material inventory turnover rate of approximately 10%. 3. Improve commonly used material inventory out of stock rate of approximately 14%. 4. The number of times where vendor's medical device permit license of MOHW expires but not detected timely is reduced from 6 times per year to 0 times. 5. Sterilization surgical instrument cover plate and sterilized wrap barcode tracking system for providing complete sterilization abnormal recall mechanism, and to ensure that abnormal items are prevented from use on any patients while the tracking purpose can be achieved and the patient safety can be ensured. 6. Implement medical device collection request unit control in order to ensure that during major epidemic occurrence, the materials in shortage can be effectively distributed and managed immediately. In addition, operating type of fabrics and fabrics for general use unit are effectively controlled to be separately distributed and managed in order to increase the usage quality of the operating type fabric. "